First Field Deployment — Full Paraffin Clearance
The inaugural field test of the WELLS Hot Rod™ was conducted on a paraffin-blocked well in Jefferson Parish. The tool was run on e-line, heated to operating temperature, and lowered through the tubing. Full clearance was confirmed by a gauge ring run immediately after the job.